A2: 3 RFQ of:
10 PVC Pass Through
15 Banded Pull Apart
20 Banded Good Morning

.
A3: For Time: 250M Row
30 BallSlam (20/15#)
.
B1: 2 RFQ of:
3 Hang Snatch Pull
3 Hang Muscle Snatch
3 Hang Power Snatch
.
B2: Hang Power Snatch- Build  To A Challenging Double
Build up heavy with no misses; Rest as needed between working sets.
.
C: AMRAP 7 of:
3-5 Chest To Bar
6 Power Clean (95/65)
8 Box Jump (24/20″)
10 WallBall (20#-10’/14#-9′)